Justin's Shared Docs

View Original

Scheme of Fesibility Study on ## Industrial Park

Table of Contents

Chapter one General introduction

I. Project name and construction unit

1.The project name

2.Project Construction Unit

Ii. Basis and principle of compilation

1.Project preparation Basis

2.Principles of Project Preparation

Iii. Project Overview

1.Site of project construction/proposed construction

2.Content and scale of project construction

3.Project nature

4.Total investment and financing of the project

5.Project construction period

Iv. Main technical and economic indicators of the project

Chapter two project background and necessity analysis

I. Background of project proposal (mainly including the purpose and significance of industrial park planning, as well as the overview of the favorable conditions and restricting factors of industrial park development)

Ii. Necessity analysis of project construction

Feasibility analysis of project construction

1.Policy feasibility (Analysis of supporting policies of governments at all levels for XXXX Industrial Park)

2.Location feasibility (advantages of location, traffic conditions, etc.)

3.Market feasibility (market prospect of project products)

4.Management feasibility

5.Financial viability (project profitability, resilience, etc.)

Chapter three market analysis and forecast

I. Current situation and development trend of XXXX industry

1.Current situation of XXXX industry in China

2.Development trend and prospect of XXXX industry in China

3.Problems existing in the development of XXXX industry in China

Ii. Project target market analysis

Three, competition analysis

1.Development status of XXXX Industrial Park in China (mainly including the number of industrial parks, geographical distribution, profit model, development model, etc.)

2.Comparison of main competition of XXXX Industrial Park

4. Analysis of advantages and disadvantages of XXXX Industrial Park construction project

1.Favorable conditions

2.Restricting factors

Chapter IV Overall Construction Plan of the project

I. Park positioning (mainly including industrial positioning and construction positioning)

Ii. Direction or service scope of key industries in the Park (including the establishment of industrial chains within the park)

Iii. Operation characteristics of the Park

Iv. Functional planning of the park (mainly including functional zoning of the industrial park, construction scale and industrial layout of each functional zone, and ratio of investment attraction and self-use of the main functional zone)

Chapter 5 Business model of the project

I. Operation mode

Second, regional layout

Iii. Transaction mode and Profit Mode of the Park (including online and offline transaction mode of XXXX Park)

Iv. Cooperation mode and partners

V. Development planning (Development goals and corresponding measures at each stage)

Chapter VI Project Site and Construction Conditions

1. Project site selection

1.Project Construction Site

2.Project site land ownership category and occupation area

3.Land use status

4.Suggestions on project site selection

Ii. Project construction conditions

1.Location advantage condition

2.Transportation conditions

3.Urban planning and social environmental conditions

4.Public facilities Social support conditions (water, electricity, gas, living welfare)

5.Construction conditions

Chapter VII Project technical plan, Equipment plan and engineering plan

I. Technical scheme

1.Basic principles of technical solution selection

2.Production process of the project

3.Project Technical Source

Ii. Main equipment scheme

1.Principle of main equipment selection

2.Device Configuration Scheme

3.Equipment procurement method

Iii. Project plan

1.Principle of main equipment selection

2.Main construction, structure engineering scheme

Chapter VIII General project drawing, Transportation and public Utility Auxiliary Works

1. General layout

Ii. On-site and off-site transportation

1.Off-site transport volume and mode of transport

2.Volume and mode of transport

3.Transport facilities and equipment

Iii. Auxiliary public works of the project

1.Project water supply and drainage engineering

2.Project Power Supply Engineering

3.Project communication facility

4.Project heating facilities

5.Air separation, air pressure and refrigeration facilities

6.Project maintenance facilities

7.Project storage facilities

Chapter IX Energy and water saving of Projects

One, energy conservation analysis

1.Analysis of energy saving Measures

2.Analysis of energy consumption index

Two, water-saving analysis

1.Analysis of water-saving measures

2.Analysis of energy consumption index

Chapter X Project environmental impact assessment

I. Environmental conditions of the site

The impact of project construction and production on the environment

1.Environmental impact of project construction

2.The impact of pollutants produced in the project production process on the environment

Environmental protection measures

Iv. Environmental protection standards to be adopted by the project

5. Environmental impact assessment

Chapter 11 Project Labor safety, health and fire control

I. Hazard factors and degree

Ii. Safety measures

1.Adopt safe production and hazard - free process and equipment

2.Protective measures for dangerous parts and operations

3.Protective measures in dangerous places

4.Occupational disease prevention and health care measures

Three, fire control facilities

1.Fire hazard analysis

2.Fire rating

3.Fire control facilities

Chapter XII Project organization and Human resources allocation

I. Project organization

1.Project legal person establishment plan

2.Organizational plan and system diagram of project management organization

3.Adaptability analysis of project organization

Ii. Allocation of project human resources

1.Production shift

2.Labor quantity and skill quality requirements

3.Employee wages and benefits

4.Labor productivity level analysis

5.Source of staff and recruitment plan

6.Staff Training Programme

Chapter XIII Project Implementation Schedule

I. Project construction period

Ii. Project implementation schedule

Iii. Project Implementation Schedule (horizontal line chart)

Chapter 14 Project investment Estimation

I. Basis for project investment estimation

Ii. Project construction investment estimation

Iii. Project working capital estimation

Iv. Project investment estimation Table

Chapter 15 Project financial evaluation

I. Selection of basic data and parameters for project financial evaluation

1.Financial prices

2.Calculate period and production load

3.Financial benchmark rate of return setting

4.Other calculation parameters

Ii. Project operating income Estimation (Preparing operating income estimation Table)

Iii. Project cost estimation (prepare total cost estimation table and itemized cost estimation Table)

Iv. Project financial evaluation statement

1.Project financial cash flow statement

2.Project profit and loss and profit distribution statement

5. Analysis of project profitability indicators

1.Project financial internal rate of return

2.Financial net present value

3.Payback period

4.Rate of return on investment

Vi. Project break-even analysis

Vii. Conclusion of project financial evaluation

Chapter 16 Project social evaluation

I. Analysis of the project's impact on society

Ii. Analysis of the interoperability between the project and the location

1.The attitude and participation of project stakeholders towards the project

2.The attitude and support of all levels of the project organization to the project

3.The degree to which the cultural condition of the project area ADAPTS to the project

Iii. Project social risk analysis

4. Conclusion of social evaluation of the project

Chapter 17 Project Risk Analysis

I. Identification of major risk factors of the project (policy risk, market risk, technical risk, management risk and financial risk)

Ii. Analysis of project risk degree

Iii. Project risk prevention and risk reduction measures

Chapter 18 Conclusion and suggestion of project feasibility study

I. General description of the project recommendation scheme (Project conclusion)

Ii. Suggestions related to the project

……

Original Files Download:

MAN6006CN_Scheme of Fesibility Study on ## Industrial Park

MAN6006EN_Scheme of Fesibility Study on ## Industrial Park